Resources > Resource Utilization

One of the advanced features of Ganttic is the ability to calculate and display resource utilization. The percentage is shown on the right of every resources name. It shows the available work time covered by tasks in the visible time range. If you change the length of visible time period then the utilization figure will change as well. 

Resource capacity utilization based on visible time period